• Hydrologic and Hydraulic
Studies
• Master Drainage Planning
• Flood Insurance Studies
• Map Revision Requests (CLOMRs & LOMRs)
• Watershed Impact Studies
• Flood Control Design
• Storm Drainage Design
• Detention Basin Design
• Bridge Scour Studies
• Water Supply Planning
• Water Master Plans
• Water Distribution System Modeling
• Ground and Elevated Storage Tank Design
• Pump Station Design
• Water Line Design
• Well Design
• Wastewater Master Plans
• Infiltration/Inflow Analysis
• Gravity Sewer Line Design
• Force Main Design
• Lift Station Analysis and Design
• Wastewater Treatment Plant Improvements
• Sanitary Sewer Rehabilitation
Preliminary Drainage
Evaluation & Improvements Design-Oak Hollow Estates-City of Kerrville
Bishop Street Drainage Improvements-City of San
Marcos
Site Development and Utility Improvements-Kerr
County Sheriff’s Annex, Kerrville
Preliminary Drainage Evaluation-Burleson
Boulevard-City of Kerrville
Hydraulic Evaluation for James Kiehl River Bend
Park-Kendall County
Site Development and Utility Improvements-Country
Club Apartments-Kerrville
Methodist Encampment Water Supply Well-City of
Kerrville
Emergency Action Plan-Ingram Lake Dam, Kerr County
12-inch Waterline and 6-Inch Sanitary Sewer along
Glen Road and Jackson Road-City of Kerrville
Joshua Springs Park Dams Hydrologic
Analysis-Kendall County